• LOGI-KIT

    ZERO

    LOGI-KIT ZERO

    Configure your personal LOGI-KIT!

    With LOGI-KIT ZERO you save expenses regarding manual forklift truck operations and increase your warehouse performance. With only a few klicks the configurator calculates the potential of a LOGI-KIT solution based on your warehouse parameters.

    Please enter the required information below.

    Double cycles per day

    arrow0%

    The performance of 10 double cycles per day is about equivalent to the performance of 10 forklift trucks. A 10--shift operation equals about 10 full-time equivalent employees (FTE). Alternatively, the performance increases from 10 by 10% to 10 double cycles per day. This equals the performance of about 10 forklift trucks with 10 FTE.


    Assumptions: A double cycle is defined by the process of taking a load unit from the in-feed, storing it in an empty position, running empty to another position, retrieving a load unit and transporting it to the out-feed (= in-feed); Double cycles per forklift truck and hour = 11,00; Hours per work shift = 12,0; Calculation of double cycles based on FEM 9.851 (case 1)

    FAQs

    Do you have questions about our automation solutions? Here you will find frequently asked questions and answers.

    FAQs